Start with the site and the operating need
Agree the zones, users, endpoints and operating hours before comparing equipment. Identify who will operate each system and which interfaces need joint testing.
- Site inputs: Floor plans, endpoint schedule, existing systems and growth allowance.
- Clear scope: Include access control, public address and other ELV interfaces only where required.