BrightGate — Gateway to Digital IntelligenceالعربيةContact us ↗

Professional services for organisations in Saudi Arabia, from BrightGate in Riyadh. Scope, delivery plans and acceptance criteria are agreed around your project requirements.

Illustrative computing & hybrid infrastructure professional-services scene

IT & Infrastructure

Computing & Hybrid Infrastructure

SERVICE ENGINEERING GUIDE

Build a platform around the workloads it must run. We translate application dependencies, recovery objectives and growth into compute, storage, virtualisation and backup work packages, with migration and recovery evidence your operations team can use.

Discuss your requirements ↗
01
01

Compute & virtualisation

Size CPU, memory and host capacity against measured workloads. Install hypervisors, management services and clustered resources, with separation between management, migration and application networks.

Project output

Host build sheets and resource allocation baseline.

02

Storage & data paths

Assess block, file and object requirements. Configure storage pools, access permissions and redundant paths; align capacity, latency and retention with the workload rather than advertised peak performance.

Project output

Volume map, access matrix and performance baseline.

03

Backup & recoverability

Configure protection policies and isolated recovery access where supported. Test file, VM and application restoration against agreed recovery-point and recovery-time objectives; record dependencies and unsuccessful scenarios.

Project output

Restore evidence and a sequenced recovery runbook.

04

Hybrid migration

Map applications into migration waves; validate identity, connectivity, DNS and backup before cutover. Rehearse a representative workload and use a decision gate for rollback.

Project output

Wave plan, cutover checklist and operational handover.

02

Virtualisation / HCI

Virtualisation runs isolated workloads on shared hosts. Hyperconverged infrastructure combines compute and software-defined storage; design choices depend on workload and platform support.

High availability

Redundant components reduce some interruption risks. Their failure domains, spare capacity and recovery behaviour must be tested; redundancy is not the same as backup.

RPO / RTO

RPO expresses the tolerated recovery-point data loss; RTO expresses the target time to restore service. Both are agreed business objectives and must be tested.

03

Illustrative patterns for project discussions. Final topology, sizing, products and acceptance criteria are developed against your requirements. These are BrightGate concept diagrams, not vendor-certified designs.

Clustered compute with protected recovery
Clustered compute with protected recoveryApplication workloads run on a sized cluster with storage appropriate to the selected architecture. Backups follow a separate protection path. High availability, replication and backup solve different problems; a cluster alone does not prove recoverability.BRIGHTGATE / SOLUTION ENGINEERINGREFERENCE ARCHITECTUREPRODUCTION CLUSTER ·FAILURE DOMAINSPROTECTED RECOVERYBOUNDARYApplicationsHost AHost BShared / HCI storageBackup repositoryRecovery zoneConcept view · final sizing and topology follow the agreed project scope

On smaller screens, scroll the diagram sideways to see all components.

Solid: main relationship or sequenceDashed: supporting, control or feedback relationship

Application workloads run on a sized cluster with storage appropriate to the selected architecture. Backups follow a separate protection path. High availability, replication and backup solve different problems; a cluster alone does not prove recoverability.

Design practices to apply

  • Reserve capacity for the agreed failure scenario.
  • Keep backup administration separate where feasible.
  • Validate recovery in a controlled environment.
04

Examples to evaluate during scoping. Selection, supported features, hardware and licences depend on the agreed solution; a product mention does not imply a certification or an included purchase.

05

Acceptance evidence

Workload readiness

Document resource use and application owner approval after migration.

Resilience

Exercise the agreed host or path failure and record service behaviour.

Recovery

Restore selected workloads and compare results with agreed RPO/RTO targets.

View the complete capability checklist
  • Rack and blade server deployment: HPE, Dell and Lenovo
  • Virtualisation and HCI: VMware and Nutanix environments
  • SAN / NAS storage, multipathing and resilience
  • Backup, immutable-copy design and restore validation
  • Hybrid-cloud connectivity and workload migration
  • Operating-system hardening, patch baselines and management
  • VDI and end-user compute infrastructure
  • Capacity planning, monitoring and disaster-recovery testing

Explore BrightGate